Projects

We carry out each project individually, based on geotechnical, topographical, and local regulations. Based on prior studies, we design and calculate the most optimal structure, adjusting the materials to what is strictly necessary to comply with the regulations in force in each case and thus adjust the overall cost of the project.
Asset 4.png

Thorenc

Location: Andon, France.
Total power: 50MW

Structure Type: Fixed Structure
Configuration: 3V9
Terrain inclination: 45º NS and 15º EO

Reims Project

Base 112

Location: Reims, France
Year: 2021
Total power: 14.82 MW

Structure Type: Fixed Structure
Configuration: 2Vx16 

Orchaise

Location: Villeherviers, France
Year: 2021
Total power: 8.24 MW

Structure Type: Fixed Structure
Configuration: 3Vx16

Orchaise Project

Oruro

Location: Oruro, Bolivia
Year: 2018
Total power: 50MW

Structure Type: Fixed Structure
Configuration: 2V16 V30

Mata de Palma

Location: Dominican Republic
Year: 2020
Total power: 67.5 MW

Structure Type: Fixed Structure
Configuration: 2V16 V30

Dominion Project

Espiet

Location: Canabier, France
Year: 2021
Total power: 1.25 MW

Structure Type: Fixed Structure
Configuration: 2V26 