We carry out each project individually, based on geotechnical, topographical, and local regulations. Based on prior studies, we design and calculate the most optimal structure, adjusting the materials to what is strictly necessary to comply with the regulations in force in each case and thus adjust the overall cost of the project.

Thorenc
Location: Andon, France.
Total power: 50MW
Structure Type: Fixed Structure
Configuration: 3V9
Terrain inclination: 45º NS and 15º EO

Base 112
Location: Reims, France
Year: 2021
Total power: 14.82 MW
Structure Type: Fixed Structure
Configuration: 2Vx16
Orchaise
Location: Villeherviers, France
Year: 2021
Total power: 8.24 MW
Structure Type: Fixed Structure
Configuration: 3Vx16

Oruro
Location: Oruro, Bolivia
Year: 2018
Total power: 50MW
Structure Type: Fixed Structure
Configuration: 2V16 V30
Mata de Palma
Location: Dominican Republic
Year: 2020
Total power: 67.5 MW
Structure Type: Fixed Structure
Configuration: 2V16 V30

Espiet
Location: Canabier, France
Year: 2021
Total power: 1.25 MW
Structure Type: Fixed Structure
Configuration: 2V26